نتایج جستجو برای: resource constraints

تعداد نتایج: 386225  

Dehua Xu, Hongxing Li Jinquan Li,

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

amir mohammad-zadeh mohammad amin nayebi, naser hamidi yusof ebrahimi-sajas

Calculating total cast of bank resources procurement methods which include current -free loan deposit, saving interest-free loan deposit, regular and net short-term investment deposit, long-term investment deposit and surety bond cash deposit and presenting their optimal integration require precise scientific studies. Hence, this study is an attempt to know which methods are the best optimal in...

Journal: :journal of optimization in industrial engineering 2010
amir mohammad-zadeh naser hamidi mohammad amin nayebi yusof ebrahimi-sajas

calculating total cast of bank resources procurement methods which include current -free loan deposit, saving interest-free loan deposit, regular and net short-term investment deposit, long-term investment deposit and surety bond cash deposit and presenting their optimal integration require precise scientific studies. hence, this study is an attempt to know which methods are the best optimal in...

Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...

Journal: :international journal of supply and operations management 2015
mohammad hassan sebt mohammad reza afshar yagub alipouri

in this paper, a new genetic algorithm (ga) is presented for solving the multi-mode resource-constrained project scheduling problem (mrcpsp) with minimization of project makespan as the objective subject to resource and precedence constraints. a random key and the related mode list (ml) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (mssg...

Journal: :ACM Transactions on Computational Logic 2003

Journal: :Archives of Internal Medicine 2005

A. Csébfalvi,

The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید